Construction

New London Public Schools is in the first of three design phases for the North Campus: Schematic Design, Design Development and Construction Documents. These drawings represent the most current design in the Schematic Design stage.

  • Schematic Design – The architect, Antinozzi Associates, takes the programming (The list of spaces needed for the building.) and turns them into the preliminary floor plans. The Schematic Design phase will be completed in January 2019. 
  • Design DevelopmentAntinozzi Associates develops the Schematic Design adding auxiliary spaces and developing the exterior and interior elevations, mechanical, electrical, fire protection, site drawings, etc. to the next level of detail.
  • Construction Documents – This phase builds upon design development and finalizes all details for construction.

North Campus Construction Timeline

North Campus Timeline
North Campus Timeline


North Campus Exterior


New London High School Exterior

New London High School Exterior

New London High School Exterior

New London High School Exterior

New London High School Exterior

New London High School Exterior

New London High School Ground Floor
New London High School Ground Floor

New London High School Main Floor

New London High School Main Floor
New London High School Second and Third Floor
New London High School Second and Third Floor

50% Design Development Drawings 

The 50% Design Development Submission printing was done to show the progress that has been made on the project over the last few months.  Drawings are included in the set for the various disciplines of work that are a part of the scope:  Site, Architectural, Structural, Mechanical, Plumbing, Fire Protection, Electrical and Technology.  At this point some sheets are more developed than others.  These prints are used to review the design with the staff and administration of the high school and to coordinate the efforts of all the members of the team.  Within each discipline there are various drawings types that show different aspects of the project:  demolition plans, site plans, floor plans, reflected ceiling plans, exterior elevations, wall sections, schedules, diagrams and enlarged details.  More information will be added to all drawings as the team works towards the conclusion of the Design Development Phase at the end of July.  Then starting in August we will technically be in the Construction Document Phase of the project which will last another five months until the end of the year.  More and more details are added to the set of documents in this CD phase in an effort to address all construction conditions throughout the building before bidding the work in early next year and then starting construction in May 2020.

* We will continue to update this page as the New London Public School construction project moves forward.